About Us

Procurement

Expression of interest

Provision of Engineering Services

Deadline: August 31, 2025 at 4:00 P.M. AST

Phoenix Park Gas Processors Limited (PPGPL) invites qualified Engineering Contractors to submit Expressions of Interest for the provision of services related to:

    • Technical studies (optimization, safety, energy, reliability)
    • Pre-FEED and FEED studies
    • Detail engineering design
    • Scheduling and project controls
    • EPC, EPCM, and construction management services

These services span Process, Mechanical, Electrical & Instrumentation, and Civil/Structural disciplines in the midstream energy sector.

Expression of interest

Provision of Brokerage Services

Deadline: August 31, 2025, at 4:00 P.M. AST

Phoenix Park Gas Processors Limited (PPGPL) invites Brokerage Contractors to submit Expressions of Interest to:

    • Sourcing service providers for the procurement of goods and services.

Expression of interest

Asset Integrity Experts Wanted

Phoenix Park Gas Processors Limited (PPGPL) invites Expressions of Interest (EOI) from experienced service providers to develop and implement a comprehensive Asset Management System aligned with ISO 55000 or other internationally recognized standards.

This system will support performance, risk reduction, and alignment with ISO 55000 and IFRS standards across a multi-facility operation.

We’re looking for partners with a strong track record in:
    • Gap assessments and AIM rating
    • ISO documentation and implementation
    • Certification training and audit readiness
    • Asset lifecycle optimization

The Expression of Interest and accompanying documents must be received by PPGPL no later than August 31, 2025 at 4:00 P. M. AST, via e-mail to the contact person stated below. Please indicate in the subject line of email: Ref.: “Development and Implementation of an Asset Management System in Compliance with the ISO 55000 Series” on all submissions. This call for Expression of Interest does not constitute solicitation or tender. PPGPL reserves the right to change or cancel the requirement at any time during the EOI and/or the subsequent tendering process.

Expression of interest

Plant Maintenance Audit

Phoenix Park Gas Processors Limited (PPGPL) is seeking EOI for the provision of services to conduct a Plant Maintenance Audit. The audit will evaluate the performance and integrity of PPGPL’s current maintenance processes and recommend practical improvements.

Required Expertise:
  • Maintenance performance evaluation
  • Operational integrity assessment
  • Risk and gap identification
  • Practical and strategic recommendations

Expression of interest

Heater Replacement Project

The strategy for execution of the Heater Replacement Project is to utilize a fixed lump sum Engineering, Procurement and Construction (EPC) contract. The project is brownfield for which the scope consists of the following:

  • Engineering, Procurement and Construction:
    • Hot Oil Heater
    • Regeneration Gas Heater
    • Hot Tap connections
  • Pre-commissioning
  • As-built drawings

The H-201 and H-501 Direct Fired Heaters are essential components for the gas regeneration and heat medium processes at the facility. Both units have been in operation for over 30 years. It has been decided to replace both the H-201 and H-501 units to address risks related to equipment obsolescence, code compliance, and operability concerns. All equipment, material, and resources are to be supplied by the Contractor.

Procurement activities

SCHEDULE OF PLANNED PROCUREMENT ACTIVITIES FOR 2025

pre-qualification

INVITATION TO REGISTER AND PRE-QUALIFY, CONTRACTORS AND SUPPLIERS

Procurement activities

SCHEDULE OF PLANNED PROCUREMENT ACTIVITIES FOR 2024

June 2025

May 2025

April 2025

October 2024

September 2024

August 2024

March 2024

February 2024

January 2024