Heater Replacement Project

The strategy for execution of the Heater Replacement Project is to utilize a fixed lump sum Engineering, Procurement and Construction (EPC) contract. The project is brownfield for which the scope consists of the following:

  • Engineering, Procurement and Construction:
    • Hot Oil Heater
    • Regeneration Gas Heater
    • Hot Tap connections
  • Pre-commissioning
  • As-built drawings

The H-201 and H-501 Direct Fired Heaters are essential components for the gas regeneration and heat medium processes at the facility. Both units have been in operation for over 30 years. It has been decided to replace both the H-201 and H-501 units to address risks related to equipment obsolescence, code compliance, and operability concerns. All equipment, material, and resources are to be supplied by the Contractor.

Expression of interest

Provision of Engineering and Brokerage Services

PPGPL consistently engages Engineering Contractors to execute a variety of work on the plant, including but not limited to:

    • Technical and Engineering Evaluations and Studies related to plant optimization, reliability, safety, obsolescence management, efficiency improvements, and energy management
    • Pre-FEED and FEED (Front-End Engineering) Studies
    • Detail Engineering Designs
    • Scheduling and Project Controls
    • Engineering, Procurement and Construction Services; Engineering, Procurement and Construction Management Services; Construction Management Services

These works encompass all the major Engineering disciplines in the mid-stream energy sector such as Process, Mechanical, Electrical, and Instrumentation and Civil/Structural.

PPGPL is exploring two (2) options related to this EOI (i) Engineering Services and (ii) Brokerage Services for (i) Engineering Services and (ii) Procurement of Goods and Services

Procurement activities

SCHEDULE OF PLANNED PROCUREMENT ACTIVITIES FOR 2025

pre-qualification

INVITATION TO REGISTER AND PRE-QUALIFY, CONTRACTORS AND SUPPLIERS

Procurement activities

SCHEDULE OF PLANNED PROCUREMENT ACTIVITIES FOR 2024

October 2024

September 2024

August 2024

March 2024

February 2024

January 2024